Logistic transport passing through road transport in Palembang city has been very high. To support green Transport, it is recommended to convert some of land logistic transports to river transport. However, the river transport has not been ready in terms of dredging and maintaining water level of Musi River. Furthermore, Boombaru Port, which has been shallow, and has high tidal level difference, can cause the process of loading and unloading become longer. High dwelling time is one of many problems that happen in port’s container terminal in Indonesia. This is commonly caused by longer loading and unloading time than those ports with high navigability and good handling equipment. Loading and unloading time depends on some factors, i.e ship size, limitation of equipment and stacking yard, a shallow port basin, tidal period and tidal magnitude. This paper aims to model the loading and unloading Time at Container Terminal of Boombaru Port, and analyze the effect of some factors on loading and unloading time. The model derived is Y = 0.501 X1 – 0.021 X2 – 2.63 X3 – 29.745, which X1 is Length Over All (m), X2 is Low Tide Elevation (cm) and X3 is duration of tidal period (hour).
Analysis of Model Loading and Unloading Time of Ships at Boom Baru Port, Palembang, Indonesia
2017
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Europäisches Patentamt | 2015
|Effect of sedimentation volume on productivity and dwelling time of ships at bom baru port
DOAJ | 2017
|METHOD FOR CONTROLLING PORT LOADING AND UNLOADING APPARATUS AND PORT LOADING AND UNLOADING APPARATUS
Europäisches Patentamt | 2016
|Method for controlling port loading and unloading apparatus and port loading and unloading apparatus
Europäisches Patentamt | 2017
|Algonquin loading and unloading equipment for ships
Engineering Index Backfile | 1961