A variety of methodologies are being used across Europe for the estimation of railway infrastructure capacity. This paper introduces the basic principles of the methodologies used – analytical methodology (e.g. Slovak railways), UIC methodology, and the graphically developed methodology of the Department of Railway Transport, University of Žilina (KŽD). On the basis of these new approaches, the occupation time estimation is researched. This new method is based on a graphic approach that uses operational time intervals as part of occupation time in accordance with the Slovak methodology. The new methodology concerns graphic capacity estimation and is a conceptual framework developed by the authors for easier evaluation of occupation time in train traffic diagrams.
New Graphical Approach to Railway Infrastructure Capacity Analysis
2015
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Railway infrastructure saturation using Constraint Programming approach
British Library Conference Proceedings | 2002
|Revised Estimation of Public Railway Infrastructure Line Capacity: Lithuanian Case
Springer Verlag | 2023
|Northern Railway: Strengthening infrastructure
IuD Bahn | 2008
|British Library Conference Proceedings | 2004
|