A variety of methodologies are being used across Europe for the estimation of railway infrastructure capacity. This paper introduces the basic principles of the methodologies used – analytical methodology (e.g. Slovak railways), UIC methodology, and the graphically developed methodology of the Department of Railway Transport, University of Žilina (KŽD). On the basis of these new approaches, the occupation time estimation is researched. This new method is based on a graphic approach that uses operational time intervals as part of occupation time in accordance with the Slovak methodology. The new methodology concerns graphic capacity estimation and is a conceptual framework developed by the authors for easier evaluation of occupation time in train traffic diagrams.


    Access

    Download


    Export, share and cite



    Title :

    New Graphical Approach to Railway Infrastructure Capacity Analysis


    Contributors:


    Publication date :

    2015




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    Bridging the gap between infrastructure capacity allocation and market-oriented railway: an algorithmic approach

    Nikola Stojadinović / Branislav Bošković / Mirjana Bugarinović | DOAJ | 2019

    Free access

    Railway infrastructure saturation using Constraint Programming approach

    Rodriguez, J. / Delorme, X. / Gandibleux, X. | British Library Conference Proceedings | 2002



    Northern Railway: Strengthening infrastructure

    Prakash, Shri | IuD Bahn | 2008