A variety of methodologies are being used across Europe for the estimation of railway infrastructure capacity. This paper introduces the basic principles of the methodologies used – analytical methodology (e.g. Slovak railways), UIC methodology, and the graphically developed methodology of the Department of Railway Transport, University of Žilina (KŽD). On the basis of these new approaches, the occupation time estimation is researched. This new method is based on a graphic approach that uses operational time intervals as part of occupation time in accordance with the Slovak methodology. The new methodology concerns graphic capacity estimation and is a conceptual framework developed by the authors for easier evaluation of occupation time in train traffic diagrams.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    New Graphical Approach to Railway Infrastructure Capacity Analysis


    Beteiligte:
    Jozef Gašparík (Autor:in) / Borna Abramović (Autor:in) / Martin Halás (Autor:in)


    Erscheinungsdatum :

    2015




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt





    QUALITY MANAGEMENT IN RAILWAY TRANSPORT - TRAFFIC CAPACITY VS. INFRASTRUCTURE CAPACITY

    Catalin Laurentiu Bulgariu / Mihai Ciupan / Mihail Aurel Titu | DOAJ | 2021

    Freier Zugriff

    Bridging the gap between infrastructure capacity allocation and market-oriented railway: an algorithmic approach

    Nikola Stojadinović / Branislav Bošković / Mirjana Bugarinović | DOAJ | 2019

    Freier Zugriff


    Railway infrastructure saturation using Constraint Programming approach

    Rodriguez, J. / Delorme, X. / Gandibleux, X. | British Library Conference Proceedings | 2002