This study presents a methodology to design the traffic organization program in an expressway reconstruction project. Based on the analysis of current traffic volume and traffic direction flow, an integrated traffic organization program combining on-site traffic organization and multi-media traffic organization was put forward. The first phase of Xiangtan to Leiyang Expressway project in Hunan. China was taken as a case study. Results revealed that the proposed method was effective and valid in maintaining the traffic diversion smoothly, orderly and safely.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Design of Traffic Organization Program for Expressway Reconstruction Project: A Case Study in Hunan, China


    Contributors:
    Li, Yong-han (author) / Huang, Zheng (author) / Xie, Bing (author) / Feng, Shi-qing (author) / Li, Jun (author)

    Conference:

    14th COTA International Conference of Transportation Professionals ; 2014 ; Changsha, China


    Published in:

    CICTP 2014 ; 1881-1889


    Publication date :

    2014-06-24




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English