This study presents a methodology to design the traffic organization program in an expressway reconstruction project. Based on the analysis of current traffic volume and traffic direction flow, an integrated traffic organization program combining on-site traffic organization and multi-media traffic organization was put forward. The first phase of Xiangtan to Leiyang Expressway project in Hunan. China was taken as a case study. Results revealed that the proposed method was effective and valid in maintaining the traffic diversion smoothly, orderly and safely.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Design of Traffic Organization Program for Expressway Reconstruction Project: A Case Study in Hunan, China


    Beteiligte:
    Li, Yong-han (Autor:in) / Huang, Zheng (Autor:in) / Xie, Bing (Autor:in) / Feng, Shi-qing (Autor:in) / Li, Jun (Autor:in)

    Kongress:

    14th COTA International Conference of Transportation Professionals ; 2014 ; Changsha, China


    Erschienen in:

    CICTP 2014 ; 1881-1889


    Erscheinungsdatum :

    2014-06-24




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch