The construction of Cheng Guan high-speed railway can dramatically improve the transportation construction along areas, perfect the transport network system, improve travelling resources, and speed up urbanization. Train routing plans provide the operation section and exit station, rational and feasible routing plans association to arrange train transportation capacity is a regular method to use limited resources fully. Analyzing the characteristics of various routing plans above municipal traffic and based on the setting principles of operation routing plan, the paper comprises the multiple routing plans of Cheng Guan line from operation organization, the level of passenger service, passenger organization and quantity of vehicle and proposes the implemented recommendations for the future operation routing plan of Cheng Guan high-speed railway.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Discussion of the Train Operation Routing Plan Mode of Cheng Guan Railway


    Contributors:
    Gong, Qing (author) / Yang, Yang (author) / Ni, Shaoquan (author)

    Conference:

    Fourth International Conference on Transportation Engineering ; 2013 ; Chengdu, China


    Published in:

    ICTE 2013 ; 2051-2058


    Publication date :

    2013-10-09




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English