We calculated the different program of introducing Hepu-Zhanjiang railway into Zhanjiang terminal and discussed the layout of passenger and freight station based on transportation corridor function and Zhanjiang city planning. As to the evaluation methods, we used analytic hierarchy process to solve index weight and gave a detail steps. Testing examples proved that the comprehensive evaluation method had achieved good results.
Programs Evaluation of Introducing Epu-Zhanjiang Railway into Zhanjiang Terminal
Third International Conference on Transportation Engineering (ICTE) ; 2011 ; Chengdu, China
ICTE 2011 ; 1143-1148
2011-07-13
Conference paper
Electronic Resource
English
Scheme Choice for Introducing a Passenger Dedicated Line into a Railway Hub
British Library Conference Proceedings | 2010
|Engineering Index Backfile | 1937
|