Schemes for introducing the Yun-Gui Passenger Dedicated Line (PDL) into Baise railway hub are analyzed. Based on the analysis of existing equipment and localization of the function of the PDL station, the conditions of the existing equipment as well as the urban development planning of Baise are considered. Then in accordance with high-speed passenger station planning methods, the preliminary schemes for the Baise station are obtained. On the basis of analysis of the main factors influencing the introduction of PDL, the evaluation index system of the high-speed station layout schemes is established. The weight of the indicators is determined and the alternative schemes are compared by means of an Analytic Hierarchy Process (AHP). Finally, the optimal scheme is determined.
Scheme Choice for Introducing a Passenger Dedicated Line into a Railway Hub
Tenth International Conference of Chinese Transportation Professionals (ICCTP) ; 2010 ; Beijing, China
ICCTP 2010 ; 2629-2638
2010-07-22
Conference paper
Electronic Resource
English
Scheme Choice for Introducing a Passenger Dedicated Line into a Railway Hub
British Library Conference Proceedings | 2010
|Turnouts for the Qinhuangdao-Shenyang dedicated passenger railway
IuD Bahn | 2002
|Zhengzhou-Xi'an passenger-dedicated line
IuD Bahn | 2006
|