Integrated Planning for Steelmaking-Hot Rolling
INFORMATION AND CONTROL -SHENYANG- ; 35 , 4 ; 537-540
2006-01-01
4 pages
Article (Journal)
Unknown
| DDC: | 629.8 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimization Model and Algorithm for Lot Planning Coordination between Steelmaking and Hot Rolling
| British Library Online Contents | 2017
Batch Planning and Scheduling of Steelmaking-Continuous Casting Based on Integrated Production
| British Library Online Contents | 2011
Integrated steelmaking at the Rouge
| Tema Archive | 1987
| TIBKAT | 1988