One of the core issues for operators of passenger railways is providing sufficient number of seats for passengers while keeping operating costs at a minimum. The process a railway operator undertakes in order to achieve this is called rolling stock planning. Rolling stock planning deals with deciding how to utilise the fleet of available train units in space and time. In this thesis, rolling stock planning has been studied, using as case study DSB S-tog, the suburban passenger railway operator of the City of Copenhagen. At DSB S-tog, the rolling stock planning process is subdivided according to time horizon into two subprocesses. Firstly, there is the long-term circulation planning process, in which planning is conducted for anonymous, virtual train units months in advance. Secondly, there is the short-term train unit dispatching process, which covers the execution of the long term circulation plan. In the train unit dispatching process, the anonymous, virtual train units from the circulation planning process will have real, physical train units assigned to them. The train unit dispatching process has a short-term time horizon of days, hours and minutes and makes sure the actual, real-world train services are performed. Disruptions are also handled in this process. In the long term circulation planning phase of rolling stock planning, a large number of railway-specific requirements must be taken into account: The physical railway infrastructure must be adhered to, e.g., platform and depot track capacities, the rules of the train control system and the order in which train units may be parked so as not to obstruct each other’s movements; All trains services of the timetable must have a least one train unit assigned; Only the available rolling stock can be used in the plan; The plan should provide seating capacity according to the passenger demand and provide an even distribution of flexible space for bicycles etc.; Planned shunting operations in the depot should have sucient personnel on duty; Train units must ...


    Access

    Download


    Export, share and cite



    Title :

    Integrated Rolling Stock Planning for Suburban Passenger Railways


    Contributors:

    Publication date :

    2017-01-01


    Remarks:

    Thorlacius , P 2017 , Integrated Rolling Stock Planning for Suburban Passenger Railways . DTU Management Engineering .


    Type of media :

    Book


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    DDC:    000





    New passenger rolling-stock for railways abroad

    Engineering Index Backfile | 1930


    Passenger traffic rolling stock fleet of Swiss Federal Railways SBB

    Balzarini, G. | British Library Online Contents | 2005


    Rolling stock planning for passenger transportation

    Jonas ButkeviÄius / Leonas Povilas Lingaitis / Gediminas VaiÄiÅ«nas | DOAJ | 2004

    Free access