Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Construction Control Calculation of Yunyang Highway Cable-stayed Bridge on Changjiang River


    Contributors:
    Baokui, Z. (author) / Jixin, Y. (author) / Yan, Z. (author)

    Published in:

    Publication date :

    2004-01-01


    Size :

    4 pages



    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    Unknown


    Classification :

    DDC:    629.04



    Anchorage Zone of Cable-stayed Tower in Badong Changjiang Highway Bridge: Model Test and Spatial Stress Analysis

    Miao, P. / Shengping, C. / Tianqing, Y. | British Library Online Contents | 2004


    The cable-stayed bridge over the PO river

    Evangelista, L. / Petrangeli, M. P. / Traini, G. et al. | British Library Conference Proceedings | 2003


    Cable-stayed bridge deck crane for hoisting large-tonnage cable-stayed bridge steel beam and construction method

    LU GUANNAN / WU RUIHUAN / ZHANG HUAWU et al. | European Patent Office | 2025

    Free access


    Design and construction of the cable stayed Quetzalapa Bridge on the Mexico City/Acapulco Highway

    Revelo, C. K. / Arriota, J. / Chauvin, A. et al. | British Library Conference Proceedings | 1994