Synonyme wurden verwendet für: Verspätung
Suche ohne Synonyme: keywords:(Verspätung)

1–50 von 619 Ergebnissen
|

    1990-1991 Aviation System Capacity Plan

    NTIS | 1990
    Schlagwörter: Delay

    1991-1992 Aviation System Capacity Plan

    NTIS | 1992
    Schlagwörter: Delay

    1993 Aviation System Capacity Plan

    NTIS | 1993
    Schlagwörter: Delay

    Active Transportation and Demand Management Program (ATDM): Lessons Learned

    B. Kuhn / D. Gopalakrishna / E. Schreffler | NTIS | 2013
    Schlagwörter: Traffic delay

    Adaptive Signal Control V - Scats Evaluation in Park City, Utah

    P. T. Martin / A. Stevanovic | NTIS | 2008
    Schlagwörter: Travel delay

    Advanced ATC (Air Traffic Control): An Aircraft Perspective

    D. H. Williams / W. E. Howell / C. R. Spitzer | NTIS | 1986
    Schlagwörter: Delay , Delay reduction

    Aircraft Delays at Major U.S. Airports Can Be Reduced

    NTIS | 1979
    Schlagwörter: Delay time

    Airfield and Airspace Capacity/Delay Policy Analysis

    H. Safeer / J. Rodgers / L. Pearsall et al. | NTIS | 1981
    Schlagwörter: Delay , En route delay

    Airline Delay: 1976 - 1986: Based upon the Standardized Delay Reporting System

    K. Geisinger | NTIS | 1989
    Schlagwörter: Delay , SDRS(Standardized Delay Reporting System)

    Airline Delay Trends 1972 - 1977

    S. Morin / S. M. Horowitz | NTIS | 1978
    Schlagwörter: Delay

    Airline Delay Trends, 1973-1974. A Study of Block Time Delays, Ground and Airborne, for Scheduled Air Carriers

    H. M. Condell / S. M. Horowitz / A. S. Kaprelian | NTIS | 1976
    Schlagwörter: Delay

    Airline Delay Trends, 1974-1975. A Study of Block Time Delays, Ground and Airborne, for Scheduled Air Carriers

    H. M. Condell / S. M. Horowitz / A. S. Kaprelian | NTIS | 1977
    Schlagwörter: Delay

    Airport and Airspace Delay Model Description

    J. C. Bobick / G. J. Couluris | NTIS | 1979
    Schlagwörter: Delay , AADM(Airport and Airspace Delay Model)

    Airport Capacity Enhancement Plan

    NTIS | 1986
    Schlagwörter: Delay

    Airport Capacity Enhancement Plan

    NTIS | 1987
    Schlagwörter: Delay

    Airport Capacity Enhancement Plan, 1988

    NTIS | 1988
    Schlagwörter: Delay

    Airport Capacity Investment Handbook

    J. F. Bellantoni / L. A. Fuertes | NTIS | 1978
    Schlagwörter: Delay

    Airport Ground Access

    M. Gorstein / L. Frenkel / R. Marek | NTIS | 1978
    Schlagwörter: Delay

    Air Quality Impacts of Highway Construction and Scheduling

    D. G. Perkinson | NTIS | 1998
    Schlagwörter: Traffic delay

    Air Scatterable Land Mines as an Air Force Munition

    J. K. Walker | NTIS | 1978
    Schlagwörter: Delay

    Air Traffic Control Response to Delays: A System Study of Newark International Airport

    A. D. Evans / J. P. Clarke | NTIS | 2002
    Schlagwörter: Delay

    Analysis at Air Traffic Delays at Metropolitan Washington Airports

    J. Dratch / W. R. Fromme | NTIS | 1977
    Schlagwörter: Delay

    Analysis of Delays at Washington National Airport

    J. V. Yance | NTIS | 1968
    Schlagwörter: Delay time

    Analysis of Pedestrian Signalization in Suburban Areas

    S. C. Otis / R. B. Machemehl | NTIS | 1999
    Schlagwörter: Traffic delay

    Analysis of Potentially Correctable Landing Delays at Atlanta

    B. P. Collins | NTIS | 1979
    Schlagwörter: Delay

    Analysis of the Characteristics and Congestion Impacts of Truck-Involved Freeway Accidents

    W. W. Recker / T. F. Golob / C. W. Hsueh et al. | NTIS | 1988
    Schlagwörter: Traffic delay

    Analysis on the Impact of Rubbernecking on Urban Freeway Traffic

    H. Teng / J. P. Masinick | NTIS | 2004
    Schlagwörter: Travel delay

    An Analysis of Weapon System Acquisition Intervals, Past and Present

    G. K. Smith / E. T. Friedman | NTIS | 1980
    Schlagwörter: Delay

    An Evaluation of Permissive Left-Turn Phasing

    K. R. Agent | NTIS | 1979
    Schlagwörter: Delay time

    An Investigation of the Effects of Carbon Monoxide on Humans in the Driving Task

    F. W. Weir / M. M. Mehta / T. H. Rockwell et al. | NTIS | 1973
    Schlagwörter: Delay time

    Applications of Flight Control System Methods to an Advanced Combat Rotorcraft

    M. B. Tischler / J. W. Fletcher / P. M. Morris et al. | NTIS | 1989
    Schlagwörter: Delay