In 1975, nine oil and gas companies including Conoco sponsored a joint program to lay and recover a 10-in.-dia, grade X-42 pipeline in 1000 ft of water by the reeled pipe method. The pipe-laying vessel used in this test was Santa Fe's 'Chicksaw'. The project was successfully completed. This paper summarizes the metallurgical data on the steel pipe before and after use in the deepwater, reel-type pipe-laying test. It assesses the metallurgical problems that may be encountered in this type of laying operation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Metallurgical studies of deepwater pipeline laid by reeled pipe method


    Weitere Titelangaben:

    Metallurgische Untersuchungen der Stahlrohre, die mittels des Abhaspelverfahrens in Tiefwasser verlegt wurden


    Beteiligte:
    Chen, E.Y. (Autor:in) / Mehdizadeh, P. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1978


    Format / Umfang :

    5 Seiten, 5 Bilder, 4 Tabellen, 6 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Innovations key reeled pipe-in-pipe flowline for gulf deepwater project

    Tough, G. / Denniel, S. / Sharif, M. Al et al. | Tema Archiv | 2001


    Weld toughness study advances reeled clad pipes' deepwater potential

    Tkaczyk, Tomasz / Brisac, Gaspard / Rai, Jitender K. et al. | Tema Archiv | 2015


    Reeled pipe for dynamic riser applications

    Harland, M.O. | Tema Archiv | 1999


    Reeled monodiameter well

    Pointing, M.E. / Betts, M.J. / Bijleveld, A.F. et al. | Tema Archiv | 1999