Tests were conducted on a 1:25-scale model of the filling and emptying systems of the existing 600- by 110-ft lock of the McAlpine project. These tests were concerned with whether structurally feasible modifications of the systems would result in decreased turbulence and hawser stresses and thus permit faster filling and emptying of the lock. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Modernization of Filling and Emptying System, Existing McAlpine Lock (Old No. 41), Ohio River, Louisville, Kentucky; Hydraulic Model Investigation


    Beteiligte:
    J. H. Ables (Autor:in) / T. E. Murphy (Autor:in)

    Erscheinungsdatum :

    1967


    Format / Umfang :

    56 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch