Tests were conducted on 1 to 25 scale model of filling and emptying systems of existing 600×110-ft lock of McAlpine project on Ohio River; tests were concerned with whether structurally feasible modifications of systems would result in decreased turbulence and hawser stresses and thus permit faster filling and emptying of lock; tests showed that major improvement in performance of filling and emptying system would result from connecting the filling and emptying culverts and plugging certain ports in existing filling system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Modernization of filling and emptying system, existing McAlpine lock (old no. 41), Ohio river, Louisville, Kentucky


    Weitere Titelangaben:

    U S Waterways Experiment Station -- Tech Report


    Beteiligte:
    Ables, Jr., J.H. (Autor:in) / Murphy, T.E. (Autor:in)


    Erscheinungsdatum :

    1967


    Format / Umfang :

    46 pages


    Medientyp :

    Report


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :