Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Electrical system; Flight control system; Inertial guidance system; Propellant utilization system; and Propulsion system. (Author)
Factory Acceptance Testing of Missile 30F
1961
34 pages
Report