This report presents the results of composite testing and post-composite testing. Pertinent systems level testing is also included. Final acceptance of Project Mercury Missile 109D was based on successful performance of all missile systems in accordance with Missile Composite Checkout Procedure, Revision, and Missile Composite System Che ckout Evaluation Data. Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. (Author)
Factory Acceptance Testing of Missile 109D
1961
93 pages
Report
Keine Angabe
Englisch
Missile Technology , Surface to surface missiles , Operational readiness , Abort , Detectors , Electrical equipment , Flight control systems , Propellant control , Liquid rocket propellants , Liquid propellant rocket engines , Command and control systems , Guided missile ranges , Telemeter systems , Vernier rocket engines , Safety , Inertial guidance , Azusa , Mercury project
Factory Acceptance Testing of Missile 124D
NTIS | 1962
Factory Acceptance Testing of Missile 32E
NTIS | 1961
Factory Acceptance Testing of Missile 31F
NTIS | 1961
Factory Acceptance Testing of Missile 18F
NTIS | 1961
Factory Acceptance Testing of Missile 27D
NTIS | 1959
|