Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Electrical system; Flight control system; Guidance system; Instrumentation range safety system; Propellant utilization system; and Propulsion system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Factory Acceptance Testing of Missile 124D


    Erscheinungsdatum :

    1962


    Format / Umfang :

    71 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch