A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Space Station Assembly Phase: Flight Telerobotic Servicer Feasibility. Volume 2. Methodology and Case Study


    Beteiligte:
    J. H. Smith (Autor:in) / M. A. Gyamfi (Autor:in) / K. Volkmer (Autor:in) / W. F. Zimmerman (Autor:in)

    Erscheinungsdatum :

    1987


    Format / Umfang :

    161 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Space Station Assembly Phase: Flight Telerobotic Servicer Feasibility. Volume 1

    J. H. Smith / M. A. Gyamfi / K. Volkmer et al. | NTIS | 1987



    The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

    Smith, Jeffrey H. / Gyamfi, Max A. / Volkmer, Kent et al. | NTRS | 1987


    Flight telerobotic servicer

    Haley, Dennis | NTRS | 1990


    Flight Telerobotic Servicer

    D. Haley | NTIS | 1990