The invention relates to a gantry crane track beam and a construction method thereof.The gantry crane track beam comprises steel pipe piles and section steel beams, a track of a gantry crane is laid on the section steel beams, end plates are connected between the steel pipe piles and the section steel beams, the end plates are welded to the tops of the steel pipe piles, and the steel pipe piles are connected with the section steel beams. The lower portion of the end plate is connected with a pipe hoop used for enhancing the strength of the top of the steel pipe pile. The interior of the steel pipe pile is tamped and filled with a soil body, and the top of the steel pipe pile is filled with hard concrete. According to the gantry crane track beam and the construction method thereof, the structure of an existing track beam is simplified, the amount of concrete pouring is reduced, quick disassembly of the track beam structure is facilitated, the gantry crane track beam is suitable for the working condition of the gantry crane track beam without the reinforced concrete foundation beam construction condition, construction is conducted in the form of driving the steel pipe piles, the construction period is short, and the construction efficiency is high. The track beam structure material can be turned over, and the construction cost is reduced.
本申请涉及一种龙门吊轨道梁及其施工方法,其中龙门吊轨道梁包括:钢管桩以及型钢梁,龙门吊的轨道铺设在所述型钢梁上,所述钢管桩与所述型钢梁之间连接有端头板,所述端头板焊接在所述钢管桩的顶部,且在所述端头板的下部连接有用于加强所述钢管桩顶部强度的管箍;所述钢管桩内部夯实填满有土体,且在所述钢管桩的顶部填充有硬性混凝土。本发明中的龙门吊轨道梁及其施工方法,简化了现有轨道梁的结构,减少混凝土浇筑的方量,并且利于实现轨道梁结构的快拆,适应于不具备钢筋混凝土基础梁施工条件下龙门吊轨道梁的工况,通过打设钢管桩的形式进行施工,施工周期快,轨道梁结构材料可周转,降低了施工成本。
Gantry crane track beam and construction method thereof
一种龙门吊轨道梁及其施工方法
2024-05-03
Patent
Elektronische Ressource
Chinesisch
IPC: | B66C Krane , CRANES |
Gantry crane walking track foundation and construction method thereof
Europäisches Patentamt | 2022
|Construction method for gantry crane track beam to stretch across large-diameter shield end well
Europäisches Patentamt | 2023
|