The invention discloses an integral lifting device and mounting method for a high-altitude steel corridor in the technical field of steel corridor mounting, the integral lifting device comprises a bottom plate and a positioning frame fixedly mounted between buildings, a plurality of placing blocks are fixedly connected in the positioning frame, a sliding groove is formed in the inner side wall of the positioning frame, two bidirectional lead screws are rotatably connected in the bottom plate, and the two bidirectional lead screws are rotatably connected in the bottom plate. The circumferential surface of the bidirectional lead screw is in threaded connection with a first clamping block, a transmission mechanism, a first belt wheel mechanism and a second belt wheel mechanism are arranged on the circumferential surface of the bidirectional lead screw, rotating rods are rotationally connected to the front face and the rear face of the bottom plate correspondingly, the bidirectional lead screw drives the rotating rods to rotate through the first belt wheel mechanism, and the circumferential surface of each rotating rod is fixedly connected with a second clamping block; the side surface of the bottom plate is fixedly connected with a positioning block, the lower surface of the positioning block is slidably connected with a sliding frame, the bottom plate can be conveniently stopped at any position for limiting operation, and therefore the stability of the bottom plate is improved, and the safety of workers working above the bottom plate is guaranteed.

    本发明公开钢连廊安装技术领域的一种高空钢连廊的整体提升装置及安装方法,包括底板和固定安装在楼体之间的定位架,定位架的内部固定连接有多个放置块,定位架的内侧壁设置有滑槽,底板的内部转动连接有两根双向丝杆,双向丝杆的圆周面螺纹连接有第一夹块,双向丝杆的圆周面设置有传动机构、第一带轮机构和第二带轮机构,底板的前面和后面均转动连接有转杆,双向丝杆通过第一带轮机构驱动转杆转动,转杆的圆周面固定连接有第二夹块,底板的侧表面固定连接有定位块,定位块的下表面滑动连接有滑动架,本发明方便将底板停留在任何位置进行限位操作,从而提高了底板的稳定性,保障了工作人员在底板上方工作时的安全性。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Integral lifting device for high-altitude steel corridor and mounting method


    Weitere Titelangaben:

    一种高空钢连廊的整体提升装置及安装方法


    Beteiligte:
    LI LIQIANG (Autor:in) / JIANG ZHIJUN (Autor:in) / YAO LIUTAO (Autor:in) / SUN ZHIGUO (Autor:in) / LUO WENZHOU (Autor:in)

    Erscheinungsdatum :

    2023-03-31


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last



    High-altitude large-span steel structure corridor and lifting construction method thereof

    CHENG FEI / ZHOU CHUNYU / WANG YAKUN et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Integral lifting construction method and device for multi-layer column-free steel corridor

    TANG QIXU / HUANG WEI / CHENG CHUNXIANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Mounting method for high-altitude integral rear plug of steel box gallery

    GUO WEIQIANG / ZHANG FENGXIANG / TAN CHAOLING et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Corridor lifting system

    ZHAO JINJIA | Europäisches Patentamt | 2020

    Freier Zugriff