Construction of 16.2 km railroad tunnel on new Sanyo line of Japanese National Railways in Rokko mountains is described; estimation of tunnel water on basis of hydrological investigations is presented; volume of drawing water from tunnel is estimated at 10 cu m/min at east end, 15 cu m/min at west during construction, and at 12 to 14 cu m/min as stationary yield.
Geology and hydrology of Rokko-tunnel New Sanyo trunk line -- 1
Tokyo. Ry Tech Research Inst -- Quarterly Report
Tokyo. Railway Technical Research Institute -- Quarterly Report ; 8 , n 4 ; p 188-194
1967
7 pages
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Rokko Island Line of the Kobe New Transit System
British Library Conference Proceedings | 1993
|Die betriebliche Weiterentwicklung des Sanyo-Shinkansen
IuD Bahn | 1999
|JR-West Sanyo Shinkansen operation development
British Library Online Contents | 1999
|The N700 Shinkansen train for the Tokaido and Sanyo Shinkansen line
IuD Bahn | 2007
|