Results of 2500 hr evaluation test at U S Naval Engineering Experiment Station; test procedures, results and conclusions; purpose was to evaluate compressor-turbine wheel with blades heavier than were in Fleet service at time of test; this has resulted in forced downtime of 0.6% over 1000-hr period, and justifies extending present 500-hr overhaul period to 1000 hr.
Accelerated life tests of pair of naval gas turbines
ASME -- Paper
ASME Meeting GTP-7 ; 1958 Gas turbine
1958
9 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
GAS TURBINES IN MARINE NAVAL SERVICE*
SAE Technical Papers | 1958
|Prospects of gas turbines in naval applications
Engineering Index Backfile | 1950
|Prospects of gas turbines in naval applications
Engineering Index Backfile | 1950
|Future prospects for naval propulsion gas turbines
Tema Archiv | 1978
|