Examples of modern practice giving complete control of five substations totaling 20,000-kw. capacity; map showing Buenos Aires electrified suburban lines. (See also Ry. Gaz vol. 53, no. 11, Sept. 12, 1930 pp. 336-338, 6 figs)
Supervisory control of sub-stations on the Central argentine railway
Elec. Times
Electrical Times ; 78 , n 2022
1930
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Supervisory control of sub-stations on the Central Argentine Railway
Engineering Index Backfile | 1930
Traffic control, Central Argentine Railway
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929