Line consists of 3305 route miles; total stocks of engines and vehicles are as follows: engines, 695; coaches, 764; freight cars, 14,136, with capacity of 463,271 tons; number of employees in traffic division is 10,308, and traction division, 4818; diagrams showing organization of traffic-operating section and district traffic controller's organization; introduction of central control; communications; train control. Abstract of paper read before Inst. of Transport in Buenos Aires.
Traffic control, Central Argentine Railway
Ry. Gaz
Railway Gazette and Railway News ; 49 , n 12
1928
4 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Traffic control on the Central Argentine railway
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Central Argentine railway electrification
Engineering Index Backfile | 1935
Engineering Index Backfile | 1929