Details of Buenos Aires suburban-line electrification extension requiring 20,000-kw. new automatic converter substation to be supplied at 20,000-volt 25-cycle three-phase current; lines will be operated at 800 volts d.c. third rail system. (See also Elec. Rev vol. 104, no. 2683, Apr. 26, 1929 pp. 729-731, 5 figs; Tramway and Ry. World, vol. 65, no. 24, May 16, 1929, pp. 257-259, 5 figs.; Metropolitan Vickers Gaz., vol. 11, no. 196, July 1929, pp. 308-310, 5 figs.; and Elec. Ry., Bus and Tram Jl, vol. 60, no. 1509, June 14, 1929, pp. 351-352, 4 figs)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The Central argentine railway


    Weitere Titelangaben:

    Ry. Gaz


    Erschienen in:

    Railway Gazette ; 50 , n 21


    Erscheinungsdatum :

    1929


    Format / Umfang :

    2 pages


    Anmerkungen:

    4 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    Central Argentine railway electrification

    Engineering Index Backfile | 1935


    Traffic control, Central Argentine Railway

    Goddard, P. | Engineering Index Backfile | 1928


    Locomotive for Central argentine railway

    Engineering Index Backfile | 1929