Details of Buenos Aires suburban-line electrification extension requiring 20,000-kw. new automatic converter substation to be supplied at 20,000-volt 25-cycle three-phase current; lines will be operated at 800 volts d.c. third rail system. (See also Elec. Rev vol. 104, no. 2683, Apr. 26, 1929 pp. 729-731, 5 figs; Tramway and Ry. World, vol. 65, no. 24, May 16, 1929, pp. 257-259, 5 figs.; Metropolitan Vickers Gaz., vol. 11, no. 196, July 1929, pp. 308-310, 5 figs.; and Elec. Ry., Bus and Tram Jl, vol. 60, no. 1509, June 14, 1929, pp. 351-352, 4 figs)
The Central argentine railway
Ry. Gaz
Railway Gazette ; 50 , n 21
1929
2 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Central Argentine railway electrification
Engineering Index Backfile | 1935
Traffic control, Central Argentine Railway
Engineering Index Backfile | 1928
|Locomotive for Central argentine railway
Engineering Index Backfile | 1929