Details of Buenos Aires suburban-line electrification extension requiring 20,000-kw. new automatic converter substation to be supplied at 20,000-volt 25-cycle three-phase current; lines will be operated at 800 volts d.c. third rail system. (See also Elec. Rev vol. 104, no. 2683, Apr. 26, 1929 pp. 729-731, 5 figs; Ry. Gaz., vol. 50, no. 21, May 24, 1929, pp. 774-775, 4 figs.; Metropolitan Vickers Gaz., vol. 11, no. 196, July 1929, pp. 308-310,5 figs.; and Elec. Ry., Bus and Tram Jl, vol. 60, no. 1509, June 14, 1929, pp. 351-352, 4 figs)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The Central argentine railway


    Weitere Titelangaben:

    Tramway Ry. World


    Erschienen in:

    Erscheinungsdatum :

    1929


    Format / Umfang :

    3 pages


    Anmerkungen:

    5 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    Central Argentine railway electrification

    Engineering Index Backfile | 1935