Reorganization has effected remarkable economies in cost of building and repairing locomotives, and in time required; complete repair jobs, formerly requiring as many as sixty days, now are done in maximum of twelve; reorganization of machinery, transportation and labor distribution in plant and production methods adopted are described in detail in this account, which appeared first in the "Railway Engineer." Eng. Soc. Lib., N. Y. (15s)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Reorganization of crewe locomotive works; London, Midland and Scottish Railway. Lond.


    Weitere Titelangaben:

    Railway Engineer


    Erschienen in:

    Erscheinungsdatum :

    1929


    Format / Umfang :

    118 pages


    Anmerkungen:

    Illus., Plates, Forms


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :




    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928