Total basin plan as well as its quays and characteristics suitable for most important modern cargo vessels are discussed; layout of typical quay comprises 45 m wide earth platform along quay with five railway tracks, 40 m wide 100 m long sheds, and two railway tracks and roadway on other shed's side; normal equipment consists of four 6-ton cranes of 30 m radius; platforms are illuminated by floodlights; 60,000 ton phosphate silo will be built; five 10-ton cranes will be used for unloading of ships.
Equipment of new harbor basin of dunkirk port
L'equipement de la nouvelle darse du port de Dunkerque
Travaux ; n 365
1965
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Connection of Port of Dunkirk with large ship canal, and extension of harbor basin
Engineering Index Backfile | 1967
|Engineering Index Backfile | 1935
Works on new basin of port of Dunkirk
Engineering Index Backfile | 1961
|Online Contents | 1996
Engineering Index Backfile | 1949