New basin is 200 m wide canal; it will be separated from sea by 2530 m long breakwater and by locks from other parts of harbor; basin will comprise 715 m long wharf for handling ores and other heavy materials; 13 m minimum depth will accommodate largest ore carriers; 215 m long wharf will serve barges of inland traffic; details of dredging and construction including access roads and railroads; construction of breakwater and levee protection; lining and protection of basin abutments; bituminous insulations. (See also - n 5 May 1961 p 265-70)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Works on new basin of port of Dunkirk


    Weitere Titelangaben:

    Les travaux du nouveau bassin maritime du port de Dunkerque


    Beteiligte:
    Malegarie, H. (Autor:in)

    Erschienen in:

    Construction ; 16 , n 7


    Erscheinungsdatum :

    1961


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Französisch


    Schlagwörter :


    Port of Dunkirk

    Engineering Index Backfile | 1935


    Equipment of new harbor basin of dunkirk port

    Feve, M.M. | Engineering Index Backfile | 1965


    Port of Dunkirk profile

    Online Contents | 1996


    The port of dunkirk

    Engineering Index Backfile | 1900


    Port of Dunkirk

    Engineering Index Backfile | 1949