Of three well-known methods in use for laying culverts under existing railway embankments, experience in America points to considerable economy in favor of jacking through earthwork, where type and material of embankment permits; subject was reported on and discussed at Convention of American Railway Bridge and Building Assn. at Boston in October; committee based its report on information received from number of railways.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The placing of culvert pipes by jacking or tunnelling


    Weitere Titelangaben:

    Engineering


    Erschienen in:

    Engineering ; 127 , n 3289


    Erscheinungsdatum :

    1929


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Jacking culvert through embankment cuts cost two-thirds

    Swartout, W.C. | Engineering Index Backfile | 1926


    Jacking culvert through railway fill aided by top shield

    Tunnicliff, N.H. | Engineering Index Backfile | 1928


    Pipe-jacking versus conventional tunnelling

    Steiner, Helmut / Edlmair, Gerald / Vergeiner, Ralf | IuD Bahn | 2005


    Earth pressures on culvert pipes

    Braune, G.M. | Engineering Index Backfile | 1927


    Jacking trolley for quickly assembling culvert sections and control method

    ZHU ZHENYE / WANG JIAQING / CHEN WENYIN et al. | Europäisches Patentamt | 2021

    Freier Zugriff