[Introduction] As a new topic in the field of offshore wind farm, the management, command and dispatch of personnel and vessels is attracting significant interest. This paper introduces an intelligent vessel dispatching and personnel management system for offshore wind farm, which is first creation of its kind in China. [Method] It mainly included three aspects: (1) Efficient command and dispatch system. Efficient command and dispatch was achieved by very high frequency (VHF) marine intercom system, which realized steady intercom communications. The marine intercom system based on maritime high-frequency VHF can be achieved the steady intercom communications. With the automatic identification system (AIS) receiver and the maritime radio station, the identity information and geographical location of the surrounding vessels can be obtained. Meanwhile, the records of the vessels entering the warning zone can be archived and those vessels will also be interrogated. If any drowning staff was spotted, alerting signal would be immediately sent to the onshore command center; (2)The sea area real-time monitoring contained two parts. A far-infrared thermal imaging camera was used to realize remote monitoring for operating conditions of the wind farms. Meanwhile, two cameras and meteorological sensors were mounted on the anemometer tower, which could be used to monitor marine and surge conditions of the neighboring sea area of the wind farm; (3)An accurate marine weather forecasting sub-system was also adopted, which was capable of forecasting on-site environmental conditions such as wind speed, waves, and surges a week ahead. In addition, it can also realized tracking and forecasting of typhoon. [Result] The results suggest that the system is reliable and can realize effective management of personnel as well as vessels, and hence reduces the costs of construction, operation and maintenance concerning the offshore wind farm. [Conclusion] Therefore, the system plays an important role in enhancing the safety production management as well as improving the operation and maintenance efficiency of the offshore wind farm.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Scheme Design of Intelligent Vessel Dispatching and Personnel Management System for Offshore Wind Farm


    Beteiligte:
    YANG Yuan (Autor:in) / YANG Xi (Autor:in) / WANG Shaoyong (Autor:in) / TAN Jiangping (Autor:in) / CHEN Liang (Autor:in)


    Erscheinungsdatum :

    2020




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    APPARATUS OF VESSEL MANAGEMENT WITHIN OFFSHORE WIND FARM AND METHOD THEREOF

    JEON IN SUNG / KANG KEUM SEOK / KWAK JI YEONG et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    OFFSHORE WIND FARM

    IMAKITA AKIHIKO / CHO TAKUJI / YAMAZAKI TOSHISUKE et al. | Europäisches Patentamt | 2019

    Freier Zugriff

    Data Management in the Offshore Wind Farm System

    Didenko, Nikolay / Skripnuk, Djamilia / Kulik, Sergei et al. | Springer Verlag | 2023


    Floating offshore wind Farm installation method and system using semi-submersible crane vessel

    KIM SHIN HEE / KIM SEOUNG HEE / KIM WOO KYEOM et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Thanet Offshore Wind Farm

    Online Contents | 2010