1–20 of 59 hits
|

    Improving inspection of turnout

    Zarembski, Allan M. | IuD Bahn | 2013

    High-speed rail grinding and metal removal

    Zarembski, Allan M. | IuD Bahn | 2012

    Managing the wheel/rail interface with grinding

    Zarembski, Allan M. | IuD Bahn | 2011

    Management of total rail grinding proce

    Zarembski, Allan M. | IuD Bahn | 2011

    Mixed-traffic method

    Zarembski, Allan M. | IuD Bahn | 2011

    Guidelines for broken-rail risk

    Zarembski, Allan M. | IuD Bahn | 2009

    Grinding as part of rail management strategy

    Zarembski, Allan M. | IuD Bahn | 2008

    Does rail grinding reduce rail defect

    Zarembski, Allan M. / Palese, Joseph | IuD Bahn | 2011

    Hand-held computers earn place on track

    Zarembski, Allan M. | IuD Bahn | 2006

    Assessing the risk of track buckling

    Zarembski, Allan M. | IuD Bahn | 2005

    Analyzing rail grinding pattern

    Zarembski, Allan M. / Shaodan, Zhi | IuD Bahn | 2013

    JRC2022-79586 Forecasting Track Geometry Degradation Using GPR Based Ballast Condition

    Zarembski, Allan M. / Palese, Joseph W. / Nguyen, Mike | TIBKAT | 2022

    Stochastic Analysis of Transit Wheel Wear and Optimized Forecasting of Wheel Maintenance Requirements

    Palese, Joseph W. / Zarembski, Allan M. / Ebersole, Kyle | British Library Conference Proceedings | 2019

    Subgrade problem

    Part 1: Contributing factor
    Zarembski, Allan M. | IuD Bahn | 1995

      Subgrade problem

      Part 2: Causes and mechanism
      Zarembski, Allan M. | IuD Bahn | 1995

    Heavier axle loads prove economic

    Zarembski, Allan M. | IuD Bahn | 1998

    Lateral track strength and resistance to track shift

    Zarembski, Allan M. | IuD Bahn | 1995

    Geosynthetics in reinforced soil structure

    Zarembski, Allan M. | IuD Bahn | 1993