In this study, the recovery coefficient of tamping operation was used to design the selection method of evaluation benchmark for maintenance quality of ballast tamping operation, by considering the bedding-in process of tamping operation. The tamping operation maintenance data and the corresponding track inspection car historical data of the Shenmu–Shuozhou railway was used as the case study. The results show that the method can be used to effectively select the evaluation benchmark for maintenance quality of ballast tamping operation.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Selection Method of Evaluation Benchmark for Maintenance Quality of Ballast Tamping Operation


    Contributors:
    Li, Shiyi (author)

    Conference:

    ISCTT 2021 - 6th International Conference on Information Science, Computer Technology and Transportation ; 2021 ; Xishuangbanna, China


    Published in:

    Publication date :

    2022-01-01


    Size :

    5 pages



    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English



    Predictive Maintenance Model for Ballast Tamping

    Caetano, Luis Filipe / Teixeira, Paulo Fonseca | British Library Online Contents | 2016


    Predictive Maintenance Model for Ballast Tamping

    Caetano, Luis Filipe / Teixeira, Paulo Fonseca | ASCE | 2016


    Predictive Maintenance Model for Ballast Tamping

    Teixeira, Paulo Fonseca | Online Contents | 2016


    On the effective tamping of ballast

    Horikoshi, I. | Engineering Index Backfile | 1930


    On the effect of tamping of ballast

    Horikoshi, I. | Engineering Index Backfile | 1931