The Netherlands Railways currently uses a computer-controlled route setting based on a route setting scheme. Route management has shifted from dispatching towards planning and supervising routes. Early conflict detection and decision support (CD/DS) is needed to support this new working method. The CD/DS system effectively adjusts the route setting scheme in advance when, for example, a delayed train will cause a conflict. This paper highlights prototyping results with this system, its architecture and purposes and results of real life tests. The tests were performed to ensure the feasibility, reliability and accuracy of train movement predictions and conflict detection. The purposes and concepts of the CD/DS are discussed by Stolk.
Automatic conflict detection and advanced decision support for optimal usage of railway infrastructure: prototyping and test results
1998
9 Seiten, 2 Quellen
Conference paper
English
British Library Conference Proceedings | 1998
|Automatic conflict detection and decision support for optimal usage of railway infrastructure
British Library Conference Proceedings | 2000
|British Library Conference Proceedings | 1998
|Crisis Management Decision Support System in Railway Infrastructure Company
British Library Conference Proceedings | 2014
|