Banverket, Jernbaneverket and MTAB have been studying Malmbanan by traffic simulation. The first project was to dimension the future system. The result was a Base alternative with investments in infrastructure and investments in trains. The simulation showed that the iron ore traffic is robust and the capacity situation for freight and passenger traffic is at least as good as today. The second project was to analyse an Expansion alternative with increased iron ore traffic. The result was a rejection of the Expansion alternative. A general conclusion from these simulations is a need of improved methods in train dispatching.
Malmbanan traffic simulations: investments and capacity allocation
1998
10 Seiten, 1 Quelle
Conference paper
English
Malmbanan traffic simulations: investments and capacity allocation
| British Library Conference Proceedings | 1998
| IuD Bahn | 2002
Malmbanan transportiert Eisenerz nach Kiruna
| IuD Bahn | 2012
| IuD Bahn | 1995
Europas första taagdatasystem finns paa malmbanan
| IuD Bahn | 1996