Simultaneous engineering techniques have been applied to a SMC truck hood to reduce the lead-time for production introduction from 22 months to 12 months. Several other technologies were also applied to insure a successful product introduction in this reduced timeframe: computer definition of the hood surface for accuracy, RTM prototype tooling for early design tryout and durability testing, Finite Element Analysis to further confirm durability of the hood structure, and brittle lacquer combined with strain gaging to provide life data using a hydraulic road simulator for load inputs.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    SMC heavy duty truck hood: 12 months from concept to production


    Additional title:

    Motorhaube fuer den schweren SMC-Lastkraftwagen - 12 Montage vom Konzept zur Produktion


    Contributors:
    Morrison, R.W. (author) / Strause, P.W. (author) / Pienta, W. (author) / Krebs, J. (author)

    Published in:

    SAE-Papers ; Nov ; 1-11


    Publication date :

    1988


    Size :

    11 Seiten, 30 Bilder


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    SMC Heavy Duty Truck Hood; 12 Months From Concept to Production

    Krebs, John / Strause, Peter W. / Morrison, Robert W. et al. | SAE Technical Papers | 1988


    SMC heavy duty truck hood; 12 months from concept to production

    Morrison,R.W. / Strause,P.W. / Pienta,W. et al. | Automotive engineering | 1988


    Off-highway heavy-duty truck under-hood thermal analysis

    Mao, Shaolin / Feng, Zhigang / Michaelides, E.E. | Tema Archive | 2010


    Innovative variable turbine concept for heavy duty truck engines

    Chebli,E. / Casey,M. / Mueller,M. et al. | Automotive engineering | 2010


    Concept for a Freight Efficient Heavy Duty Truck Chassis

    Ostergaard, Erik / Angelini, Nicholas / Aguero, Raymond | British Library Conference Proceedings | 2020