Easter weekend 1989 saw the commissioning of British Rail's first Integrated Electronic Control Centre (IECC). This event marked a major change in signalling technology where mimic diagrams were replaced by colour monitors and train routesetting and regulation is now an automatic function with manual intervention if required. Liverpool Street was the first of the new generation signalling control centres to be brought into service and was closely followed by the first stage of the new control centre at York.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New generation signalling control centre


    Additional title:

    Eine neue Generation von Signalsteuerzentren


    Contributors:


    Publication date :

    1989


    Size :

    5 Seiten, 1 Quelle


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English





    Saudi signalling jumps a generation

    Barke, Stephan | IuD Bahn | 2009


    Railway signalling: the next generation

    Lesley, Lewi | IuD Bahn | 1995



    Signalling and train control

    Sherrington, C.E.R. | Engineering Index Backfile | 1930