The Austrian Federal Railway (OBB) was the first authority outside of Germany to employ the LZB 80 signalling system for high-performance locomotives and the L72 vehicle control centres. Trial operations on the new Vienna-Salzburg high-speed railway line are to begin in 1991. The entire system of continuous automatic train control comprises line and vehicle equipment for the exchange of signals via track conductor loops. Here, the author deals with just the vehicle equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Continuous automatic train control and cab signalling with the LZB 80


    Additional title:

    Dauernde automatische Zugsteuerung und Fuehrerstand-Signalgabe mit dem LZB 80


    Contributors:


    Publication date :

    1989


    Size :

    7 Seiten, 6 Quellen


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English






    Signalling and train control

    Sherrington, C.E.R. | Engineering Index Backfile | 1930


    Computorised signalling and train running control

    Engineering Index Backfile | 1965


    DEVICE FOR MONITORING AND PREDICTIVE DIAGNOSTICS OF ON-BOARD EQUIPMENT OF CONTINUOUS AUTOMATIC TRAIN SIGNALLING

    KUZMIN VLADISLAV SERGEEVICH / MERKULOV PAVEL MIKHAJLOVICH | European Patent Office | 2020

    Free access