At present, underground Line 1, Line 2, and Line 3 are running in Tianjin. In recent years, Tianjin railway experiences a rapid development, especially in 2012; the opening of lines 2 and 3 pushes Tianjin railway life into a brand-new platform. This paper established a subway operator service quality evaluation model, using AHP, to evaluate the operation of the underground lines 2 and 3 in Tianjin and then make specific countermeasures and suggestions to improve the quality of service in Tianjin subway operations.
The Evaluation for Tianjin Metro Operation
2014
8 Seiten
Conference paper
English
Metro Operation Safety Evaluation
British Library Conference Proceedings | 2014
|The Research and Application of Automatic Fare Collection System in Tianjin Metro
Trans Tech Publications | 2013
|Hydrogen energy metro operation vehicle applied to metro construction and control method
European Patent Office | 2022
|Operation Control Systems for Metro Guangzhou
British Library Online Contents | 1998
Metro Train Comfortableness-Based Operation Curve Simulation
Trans Tech Publications | 2011
|