The Three Gorges Ship Lift project is characterized by a long construction period, an amount of construction tenders, a plenty of construction teams, a multiplex levels of practitioners, much overhead work, a broad range of construction equipment, risky interference among construction operations, and simultaneous construction at different levels and/or sides, which come into grade cross operations and bring a great deal of difficulties to safety management. As a starting point by grade cross operations in Three Gorges Ship Lift, this research is as follows: 1. Analysis of the processes in operating unit; 2. Risk identification to the Falling Accidents, Objects Strike and Collapse in according to the standards of accident classification; 3. Assessment to rank of hazard on the basis of the result that the risk identification; 4. Put forward the effective measures which reduce hazard in reference to appraise concrete clauses involved. Finally, this paper will give a example as embedded parts and make risk assessment more scientific through comparing with calculating.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Research on Hazard Identification and Assessment of Grade Cross Operations in Three Gorges Ship Lift


    Contributors:
    Wang, Jian-Ping (author) / Nie, Ben-Wu (author) / Zhang, Feng-Yu (author) / Li, Zhi (author)


    Publication date :

    2013


    Size :

    5 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English





    Roll-on roll-off ship suitable for scale requirement of Yangtze River three gorges ship lift

    YU YUN / YE AIJUN / LI FUJUN et al. | European Patent Office | 2021

    Free access


    The MADM of three gorges ship gates running

    Lai, W. / Qi, H. | British Library Online Contents | 2002