Lanzhou-Xinjiang passenger dedicated line is the first high speed railway on chinas northwestern Gobi where the temperature range is large and the wind is huge. Most road section of Lan-Xin passenger dedicated line is subgrade. This paper researches the ballastless track subgrade settlement observation scheme and assessment method on area where climatic conditions is harsh and geologic conditions is complex. The result shows that: the observation accuracy of subgrade settlement tests satisfies the requirement by using Layered settlement instrument, intelligent static force level and high-accuracy Hydraulic settlement instrument; Subgrade lies upon bedrock or Gobi soil with great bearing capacity in gale area, and distance between observation sections could be increased seemly. The space between observation sections generally should be less than 100 m in areas where bedrock exposed, thick gravel soil distribute commonly; the distance between observation sections should be less than 50 m in pre-mountain Alluvial-pluvial plain areas; hyperbolic method adapt the estimate of subgrade settlement on Gobi area, and the correlation coefficient is 0.97; Subgrade settlement deformation curve converges quickly and the settlement value after 40 days reaches 85% of ultimate settlement.
Deformation Monitoring and Evaluating Technology for Subgrade of Unballasted Track on Lan-Xin Passenger Dedicated Line
CEABM, International Conference on Civil Engineering, Architecture and Building Materials, 3 ; 1152-1158
Applied Mechanics and Materials ; 351-352
2013
7 Seiten
Conference paper
English
Unballasted track gives 50 per cent lower maintenance cost
Engineering Index Backfile | 1916
|Track structure of passenger-dedicated line
IuD Bahn | 2006
|An Observation and Analysis of Passenger Dedicated Line Subgrade in Coastal Soft Soil Zone
Trans Tech Publications | 2013
|