This paper summarizes the design of open-cut subway station in Chengdu Metro line one. The station is built by cut and cover method and divided into three special parts with four different cross-sections used for main line and transfer track. Such retaining techniques as bored piles, steel pipe struts, soil nails, rock-bolts, steel-meshes, shotcrete and anchored steel cables are comprehensively used to maintain the stability of foundation pit. The anti-buoyancy coefficient of the open cut station is also derived and attains the requirement of safety and stability for the foundation pit after the utilization of these enclosure measures. The application of the design and construction technique for the subway station may provide guidance for the building of analogous subway station under similar geological and hydrogeological conditions in Chengdu.
Design of Enclosure for Subway Station Foundation Pit in Southward Extension Line of Chengdu Metro Line One
Construction and Urban Planning, ICSBM, International Conference on Structures and Building Materials, 3 ; 1122-1125
Advanced Materials Research ; 671-674
2013
4 Seiten
Conference paper
English
Passenger Volume of the Chengdu Metro Line 1 Analysis
ASCE | 2011
|Gas Monitoring: Methane and Hydrogen Sulfide - Metro Red Line Subway System
British Library Conference Proceedings | 1997
|Kyoto subway projects and extension of Tozai Line
IuD Bahn | 2006
|Barrier-Free Station Facilities of Oedo Subway Line
British Library Online Contents | 2001
|Study of Influence of Subway Station Excavation on Existing Metro Deformation
British Library Conference Proceedings | 2009
|