It is a special modality of solid-fluid conduit flow for the sand transporting procedure in wellbore. Under the action of heavy oil, because of the difference of the borehole location, the transporting mechanic of sand is not the same. For the vertical wellbore, sand particles are mainly dominated by the drag forces and carried out of the hole; however, for the horizontal wellbore, sand particles are under complex forces and show different flow state. In different flow state, the sand particles are controlled by different forces, the heavy oil’s sand transporting capacity is changed. This paper begins with the analysis of the stress of the sand particles, and deeply analyses the vertical and horizontal wellbore, the stress of sand particles in the heavy oil’s sand mixing flow procedure, and then study the heavy oil’s sand transporting capacity.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    The Transporting Mechanic of Slurry of Heavy Oil and Sand in Horizontal Wellbore


    Contributors:


    Publication date :

    2012


    Size :

    4 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    System for transporting sand for wellbore operations

    ENTCHEV PAVLIN B / HOPE CHARLES A / ANDRADE JOSE ALBERTO ORTEGA et al. | European Patent Office | 2024

    Free access

    System for Transporting Sand for Wellbore Operations

    ENTCHEV PAVLIN B / HOPE CHARLES A / ANDRADE JOSE ALBERTO ORTEGA et al. | European Patent Office | 2020

    Free access


    Mechanic

    Online Contents | 2001


    Sand core transporting device

    ZHONG JUNCHAO / CHEN JIANBO / MENG XIN | European Patent Office | 2020

    Free access