The composition scheme of speed target value of railway engineering contains the functional orientation of railway line, demand of time target value and the adaptation to the adjacent lines. The selected speed target value of railway engineering must be suited to the features of the railway, satisfied with transport requirement, accorded to railway developing strategy and realized to the best economic benefit. This paper comprehensively compares and analyzes different speed target value schemes adopted by Revamping project for Capacity expansion of WANGAN railway and a reasonable speed target value—200 km/h reserved 250 km/h is recommended.
Research on Speed Target Value of Railway Engineering
ICCAHE, International Conference on Civil, Architectural and Hydraulic Engineering, 2012 ; 1715-1720
Applied Mechanics and Materials ; 204-208
2012
6 Seiten
Conference paper
English
Research on Speed Target Value of Railway Engineering
Trans Tech Publications | 2012
|Engineering Index Backfile | 1945
|Research in railway engineering
Engineering Index Backfile | 1933
Low-speed walking mechanism for railway engineering vehicle
European Patent Office | 2023
|