Engineering bridge construction is a very complicated system work. The potential risk would occur frequently in the process from construction preparation to completion. The bridgework has fundamental features in huge investment, complex technology, broad engineering, long project life cycle and big impact if an accident happened. Compared to other highway construction process, there are more risks in the process of the bridgework. According to the method of steel tube concrete composite column bridge pier construction on bridge engineering, this thesis identifies the bigger risk factors in the procedure with the analytic hierarchy process. Combined with the technology of the MIDAS/CIVIL and imitating upper structure construction of actual construction process, it quantificationally analyses the construction risk. This could be for the reference to risk analysis on bridge project construction.
Construction Risk Assessment Research of Continual Rigid Frame Bridge with Concrete-Filled Steel High Piers
2012
5 Seiten
Conference paper
English
British Library Conference Proceedings | 2009
|Concrete-Filled Steel Tubes for Accelerated Bridge Construction
Online Contents | 2014
|Concrete-Filled Steel Tubes for Accelerated Bridge Construction
Transportation Research Record | 2014
|Formwork for bridge piers and construction method of piers using the same
European Patent Office | 2022
|