Evaluating the reliability of a network based project often involves an intensive simulation exercise to randomly generate and evaluate different possible network states. This paper proposes an algorithm to approximate the network reliability which minimizes the use of such simulation procedure. For this purpose, a space lunch vehicle project with network properties is analyzed using project scheduling techniques. Thus, the project processes are described as networks, modeled and timed by network properties and stochastically analysed using GERT, a project based process scheduling method. A set of computation experiments are conducted to employ the effectiveness and robustness of our GERT-based solution. The experimental study also indicates that our model can be effectively deployed in many practical scenarios.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Space launch vehicle project reliability analysis by using GERT


    Contributors:
    Aytulun, S.K. (author) / Ermis, M. (author)


    Publication date :

    2009


    Size :

    8 Seiten, 9 Quellen




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Space launch vehicle project reliability analysis by using GERT

    Aytulun, S.Kerem / Ermis, Murat | IEEE | 2009



    Space Launch Reliability History

    Sharp, Tymon / Hark, Frank | NTRS | 2019


    Bayesian Analysis of Launch Vehicle Reliability

    Guikema, Seth / Pate-Cornell, M. Elisabeth | AIAA | 2003


    Bayesian analysis of launch vehicle reliability

    Guikema, S. D. / Pate-Cornell, M. E. / AIAA | British Library Conference Proceedings | 2003