In this paper, the classical PF interval model, proposed for reliability centered maintenance, is used to optimize the preventive replacement policy of a subsea oil pipeline. The pipeline is subject to failure modes that may lead to oil release and pollution of the sea. The proposed replacement policy is based on regular condition measurements of the quality of an internal pipeline coating (lining). Holes in the coating will expose the pipe material (steel) to a corrosive environment. It is, therefore, important to identify holes in the coating and take action before the corrosion penetrates the pipe wall. The model proposed in the paper can be used to determine the inspection interval that minimizes the average maintenance cost per time unit. The model formulation is outlined and illustrative examples are solved. The mathematical evaluation of the replacement policy requires numerous assumptions. These assumptions have to be tailored to the specific application. The assumptions and the data provided are included for illustrative purposes to exemplify potential results that may be obtained by using the replacement policy.
Maintenance optimization for subsea oil pipelines
International Journal of Pressure Vessels and Piping ; 83 , 4 ; 236-243
2006
8 Seiten, 10 Quellen
Article (Journal)
English