This paper discusses the design and fabrication of the URSA TLP deck modules and upper column frame. The URSA TLP is installed at Mississippi Canyon 809 in over 3800 feet of water. The high rate URSA wells are produced through large diameter tubing strings inside dual cased risers. The URSA topside package includes a full drilling facility and production facilities that can process 150,000 barrels of oil and 400 million scf of gas per day. Also, as the URSA TLP has potential to act as a hub for the surrounding fields, it can carry an additional flexibility payload of about 3000 short tons.
Design and fabrication of the URSA TLP deck modules and TLP hull upper column frame
1999
11 Seiten, 4 Quellen
Conference paper
English
Design and Fabrication of the Ursa TLP Deck Modules and TLP Hull Upper Column Frame
British Library Conference Proceedings | 1999
|Ursa TLP hull design, fabrication and transportation
Tema Archive | 1999
|Ursa TLP Hull Design, Fabrication, and Transportation
British Library Conference Proceedings | 1999
|Ursa TLP Topside-Module Installation and Hull-Deck-Rig Integration
British Library Conference Proceedings | 1999
|APPARATUS FOR SUPPORTING STRUCTURE ON UPPER DECK OF HULL
European Patent Office | 2016
|