This paper describes the design and certification program for a new light twin-engine aircraft. The factors considered in the design of the aircraft, the flight testing, and the changes required for certification are described. Some of the problems encountered in flight testing, and the solutions to these problems, are also discussed. (Wassmann)
A new light twin using bonded metal construction
Ein neues zweimotoriges Flugzeug mit geklebter Metallkonstruktion
SAE-Papers ; 1-13
1979
13 Seiten, 17 Bilder
Conference paper
English
A New Light Twin Using Bonded Metal Construction
SAE Technical Papers | 1979
|Adhesive bonded structure of new pressurized piston twin aircraft
Tema Archive | 1979
|Adhesive Bonded Structure of New Pressurized Piston Twin Aircraft
SAE Technical Papers | 1979
|Engineering Index Backfile | 1954
Online Contents | 2009